TPG Road Work: Week of November 18, 2024

LORANGER—Surface treatment operations are expected to continue on five local roadways during the week of November 18.
Tangipahoa Parish President Robby Miller said Material Resources, Inc. will be performing surface treatment operations on the following roadways this week:
  • River Crest Drive
  • Tracey Lane
  • Acadiana Place
  • Pine Meadow Road
  • Steptoe Road
Motorists are advised to use alternate routes while this work is being performed.