Pavement preservation work continues on three local roadways during the week of August 24.
Tangipahoa Parish President Robby Miller said Material Resources Inc. will perform the final step of pavement preservation sealcoat on the following roadways this week: Giluso Road, General Ott Road, and Drude Road.
Intermittent delays are expected in these work zones; therefore, motorists are encouraged to use alternate routes, where possible. All work is weather permitting.